After months of ordering and finding parts and components, I now gathered most of what I need to begin working on my first pack build. I decided to order a Benofkent Props' kit, which includes nearly everything that one needs to complete a proton pack build (except for any electronics). I have also ordered a number of parts from other suppliers that will either 1) replace some of those found in the kit, 2) supplement the kit build or 3) act as redundant supply.

A very special thanks to benofkentprops, PssdffJay, Jordin, Nicholszz, Naptime, pyhasanon, nstevic01 and Spongeface for supporting me so far with my build!

Please be advised that I fully intend to follow all rules and best practices regarding build threads. If I did something wrong, please let me know as soon as possible and I will take corrective action. :)

Now, let's get to it.

To begin, I have listed my components parts with the sellers name and a link to the item (if possible). Following the list are some pictures of the items:

Pack
Neutrino wand/particle thrower
Bolts and screws

• Note: A US Imperial to SI measurements Conversation Table (for bolts and screws) is useful for reference purposes: https://www.boltdepot.com/fastener-info ... Table.aspx
  • Black ridged cap style bolts: (Edmonton Nut & Bolt): http://www.edmnut.com/
    • 4 x M3 10 mm (resistor screws)
      3 x M4 10 mm (gun disc + trigger box)
      8 x M4 16 mm (gun base + trigger)
      2 x M4 40 mm (gun track)
      6 x M5 30 mm (ribbon + ladder + clippard)
      1 x M5 80 mm (HGA)
    Shell ABD bumper bolts (Lowes):
    • 4 x M6 30 mm
    Shell mounting bolts to the motherboard (Lowes):
    • 4 x M6 30 mm
    Main parts screws: (Edmonton Nut & Bolt): http://www.edmnut.com/
    • 6 x M5.5 75 mm (3/16" x 3") self-drilling roof screws with rubber washer (2 for injectors, 2 for beam line and filter, 2 for ion arm)
    Shock mount bolt (Edmonton Nut & Bolt): http://www.edmnut.com/
    • 1 x (1/4"-20 x 2") bolt
    PPD mounting screws (D&D Bolt Supply):
    • 2 x (10 x 3/4") self-drilling screws
    Mounting hardware for aluminum motherboard to the ALICE frame pack (Canadian Tire):
    • 3 x 2" 1/4-20 round head Philips bolts/screws
      5 x 5/8" OD, 1/4" IO washers
      3 x 1/4" wingnuts
Components that I am looking to purchase
Parts that were purchased, but will not likely be used
Paints and adhesives
Photos
  • Benofkent Props Proton Pack Kit
    • Polyurethane Shell Mark 2:
      Image

      Pre-mounted aluminum motherboard:
      Image

      Other parts included in the kit:
      Image

      Vinyl Labels found in the manila envelope:
      Image
    GBFans Order:
    Image

    New old stock ALICE LC-1 Frame and used LC-1 straps:
    Image

    Blue brick 12V battery, Deluxe Spengler plate and wiring set, 6.5" and 4" speakers at 4 ohms impedance:
    Image

    Dale RH-25 and RH-50 resistors (so generously provided by Naptime):
    Image

    Dalohm PH-25 resistor (Dreamstalker)
    Image
Last edited by canpara on October 17th, 2016, 8:25 am, edited 13 times in total.
Naptime, Jonobiwan, btnkdrms and 3 others liked this
#4881053
Hooray! You're about to begin! That Benofkent shell looks great! Did they do the pre-mounting of the mobo for you? Love, love, LOVE the shots of all your parts.
#4881089
As Jonobiwan stated, Ben pre-mounts the shell to the motherboard. Ben's service is incredible, just like his communication. Whenever I have a question or concern, he usually responds within minutes. This is quite a feat, considering there is an eight hour time difference between us!

Speaking of Ben's service, your question (and response) is a perfect segway into my next update.

I had originally ordered a kit from Ben's July run, but due to an unforseen shell mould failure, my kit was delayed until August. Ben let me know as soon as it happened and he explained that he would use this opportunity to improve his shell. I was happy to be one of his first customers to receive his Mark 2 shell.

There was second delay in receiving my shell, but this one was not Ben's fault. The courrier service that Ben uses, UKMail, dropped the ball by incorrectly registering my parcel in their tracking system. The result was that my package sat in a warehouse for a week without being processed. Despite working on a number of other kits, Ben monitored the shipping situation and contacted UKMail as soon as he perceived that something was wrong. Thanks to his quick action, UKMail realized their mistake and rushed the delivery of my parcel (even though the tracking number didn't really work). In the end, I received my package through DHL here in Edmonton, Alberta, Canada.

While waiting for the kit to arrive, I started to be proactive on my kit build and I started working on three things: 1) reinforcing the vertical support bar on my knock-off ALICE LC-1 style frame from the GBFans Shop, 2) painting my cyclrotron reflectors in anodized red and 3) creating puck spacers that will be used between the ALICE frame and the aluminum motherboard.

Reinforcing the vertical support bar on the ALICE pack frame

This experience is a lesson learned that I don't recommend repeating!

As a number of builders have noticed, the vertical support bar on the knock-off ALICE LC-1 frames are rather flimsy. Inspired by Steve and Jimm's dual proton pack build thread at viewtopic.php?f=2&t=41222 and Mat's Pack Build at viewtopic.php?f=2&t=36199, I decided I was going to replace this bar with a thicker and sturdier steel bar.

I was going to do this with a friend of mine who happens to be a welder. However, once we arrived at his shop, we realized that we did not have any rivets to secure the new steel bar to the frame. We decided that we would reinforce the existing steel bar with a larger and thicker one by welding them together, like so:

Image

The benefit of this method was that the original vertical bar no longer moved and the frame felt much sturdier. The drawback, however, was that it added more weight to the frame. Furthermore, I did not foresee the gap that became quite apparent between both bars, especially at the bended area:

Image

In terms of esthetics, this was not a good solution. We spray-painted the steel bar in a matching flat black colour and I was planning to fill the gap with some Bondo, as many people have been doing with gaps in their shells, but the difference in the look would always be apparent.

In the end, I found an new old stock ALICE LC-1 frame from a supplier on eBay that included the LC-1 shoulder straps, waist strap and kidney pad that I was looking for, so I decided to order it. Although this was a large and unforeseen expense, I was very happy with my decision. The new old stock frame is much sturdier and the vertical bar is already quite a bit thicker. Since this is an original frame, I don't have to worry about the inaccuracies from the knock-off frame, namely 1) the bevel in the lower section of the vertical support bar (the original doesn't have one there), 2) the reversed (or inverted) bevel in the top portion of the vertical support bar (the original has a bevel sticking outwards away from you rather than inwards towards you), 3) drilling holes in the lower section of the frame in order to mount the motherboard (the original already has two slits in order to fit your bolts and spacers).

Painting the cyclotron reflectors in anodized red

While planning my kit build, it took me a while to decide whether or not I should include the cyclotron light kit of the 2009 video game because I wanted the look of my pack to ressemble those that were used in the original Ghostbusters movie. My dilemma was the following: if I used the TVG light kit that I had purchased from Spongeface, I would need to use clear lenses and therefore the cyclotron would not be red when the pack is turned off. Of course, if I used red lenses like those used in the original packs, the color of the lenses would interfere with the colour eminating from the RGB LEDs in the TVG light kit.

Thankfully, I came across Phil's GB1 Hero Pack Project 2014 build thread at viewtopic.php?f=2&t=37054, where he adopted an idea used by father and son Fincher team (Charles "Sephiroth" Fincher) in their proton pack build. Their solution was to paint the four cyclrotron reflectors with an anodized red reflector spray paint that will make clear lenses look red when the pack is turned off. The reflector paint won't interfere with the TVG colours of the cyclotron light kit (if they do, Phil assured me that it is to the smallest extent). Utterly brilliant! Here are the reflectors that I painted:

Image

As you can see in the next photo, I chose to use a clear frosted lens for the four cyclotron lights and I think the results look really good. I can't wait to see what they look like with the electronics!

Image

Creating spacers with hockey pucks

I came across this idea while reading PssdffJay's Proton Pack Build Thread at viewtopic.php?f=2&t=34784, which he took from Julz's Ye Olde Half Moon GB1 Spacer thread at viewtopic.php?f=2&t=30726. The dimensions I used are probably not screen accurate, but since these are spacers made from hockey pucks, I decided to use measurements that were convenient. Here is a photo of my templates with the dimensions written upon them (in both millimeters and US inches):

Image

Rather than using a hacksaw and a mitre box to cut the rubber from the hockey pucks, I used a grinder while I was at my friend's shop (the welder that I mentioned earlier). This created a lot of smoke, so it was important that the garage doors were opened and the fan was running.

Image

The results are good, but the edges of the cuts are not totally clean. I will have to retouch one bottom spacer in particular, since it ended up being slightly taller than the other. I'm not too worried about it for the time being, though. I will edit this post with another photo once I have touched it up.
Last edited by canpara on September 20th, 2016, 4:16 pm, edited 1 time in total.
Naptime, Jonobiwan, SAMIAM liked this
#4881129
Got some great looking parts from some great sellers there. Really looking forward to this build. Good luck!
canpara liked this
#4881427
Necronaut wrote:Does Edmonton Nut & Bolt do walk-in service? I was going to hit up Acklands-Grainger for cap screws tomorrow for my SC shell build but they sometimes need to special-order their stuff.
Yes! As far as I know, they only do walk-in service. However, they are only open from 7:30 to 5:00 on weekdays, which really doesn't jive well with my schedule. It's well worth their prices, though.
#4881476
canpara wrote:
Necronaut wrote:Does Edmonton Nut & Bolt do walk-in service? I was going to hit up Acklands-Grainger for cap screws tomorrow for my SC shell build but they sometimes need to special-order their stuff.
Yes! As far as I know, they only do walk-in service. However, they are only open from 7:30 to 5:00 on weekdays, which really doesn't jive well with my schedule. It's well worth their prices, though.
I should have followed your lead. Acklands has all my needed cap screw sizes, but they are strewn in a bunch of warehoused across the Prairies. Fastenal won't sell to the public, and Edmonton Fasteners only goes as small as 1/4-20.

At least Acklands can get them shipped in within 3-5 days, so all hope is not lost. And I certainly hear you about dealing with office hours only on weekdays...

Looking forward to more!
#4881674
Today I mounted the aluminum motherboard to the ALICE pack frame.

The Benofkent Props kits do not include the bolts, washers and wingnuts that are required, so I looked at GohstTarp's Proton Pack Build at viewtopic.php?f=2&t=38111&hilit=GohstTa ... Pack+Build to find out which ones I needed:
  • 3 x 2" 1/4-20 round head Philips bolts/screws
    5 x 5/8" OD, 1/4" IO washers
    3 x 1/4" wingnuts or 1/4" nylon nuts
I went to Canadian Tire and bought the bolts and wingnuts, but I didn't buy those particular washers. Instead, I used some split lock washers that I had lying around. Does anyone foresee any issues with this decision? I guess there is a risk that they may dig into the aluminum motherboard...

Moving on, Benofkent Props' motherboard does not come with the three pre-drilled holes to serve as attachment points (as opposed to the GBFans motherboard, for example).

I thought I would to use the measurements in Stefan's GB1 Proton Pack plans in order to locate the exact location of the attachment points, even though the plans clearly indicate that the upper attachment point is unknown. However, as soon as I measured the length of the Benofkent Propos motherboard, I realized that it is longer than the measurements in Stefan's plans. As you can see in the photo below, the length of the motherboard is longer by about 4 mm. This is a pretty minimal difference, but it still freaked me out at first. Remember, I am a rookie with very little confidence when it comes to drilling holes in things!

Image

I ended up drawing a vertical centre line (as in Stefan's plans) down the length of the motherboard. Then I went off on my own, ignoring Stefan's plans (meaning I wasn't worried about screen accuracy anymore). I used the lower rivets on the motherboard (used to secure the shell mounting brackets) as a reference point and drew a horizontal line overtop of them. If you recall, Benofkent Props includes the shell mounting service with their kits.

After that, I drew a parallel line one inch higher from the lower rivets. This last line represents the lower extremity of the frame (the lower portion of the frame would line-up here). After lining up the frame with the vertical and horizontal reference lines, I traced the shape of the two ALICE frame slots (located on the left and right side of the lower pack frame--the rounded rectangular holes). As for the upper attachment point, I marked its horizontal location upon the centre pencil line that I had drawn earlier. I made a best guess in terms of its vertical location.

Image

Once I drilled the quarter-inch holes through the motherboard, I mounted the motherboard to the frame in the following configuration:
  • Bottom two slots:
    Bolt --> washer --> ALICE frame slot --> rectangular spacer --> motherboard --> washer --> wingnut

    Top slot:
    Bolt --> ALICE frame vertical bar --> half-moon spacer --> motherboard --> washer --> wingbut
Once the frame was attached to the motherboard, this is what it looked like (view from the inside of the pack without the shell):

Image

Here is a view from the flip-side:

Image

A view from the bottom:

Image

And lastly, a side view:

Image

In that last picture, you'll see that there is a slight gap between the half-moon spacer and the motherboard. I later corrected this gap by turning the spacer 180 degrees.

Any thoughts? Judging from the pictures, does everything seem to align properly? Anything I should correct?
#4881678
It looks pretty good. It's hard to tell if yours is higher than mine without measuring but I'd have to open it up to do that. Here is a pick of my holes (Gbfans motherboard).

It does look like its riding high on your back. I do think your shoulder straps need to be looser on the top strap but that's more on preference. What does it look like from the front? Straight forward? That's a good indicator of how high it is based on how much is higher than your shoulder, but again personal preference. My preference would be that it should be at the top of the collar of the short you're wearing in that photo.

Image
#4881995
PssdffJay wrote:It does look like its riding high on your back. I do think your shoulder straps need to be looser on the top strap but that's more on preference. What does it look like from the front? Straight forward? That's a good indicator of how high it is based on how much is higher than your shoulder, but again personal preference. My preference would be that it should be at the top of the collar of the short you're wearing in that photo.
I'll try to get some pictures for you this evening! I hastily put on the straps in those pictures, so they weren't adjusted and they definitely need to be looser at the top.

What do you guys think of the horizontal (x-axis) length of my half-moon spacer? Does it look too long in the pictures? In other words, should the motherboard be leaning a little more towards my back near the top of the pack frame?

Thanks again for the feedback!
#4882077
While a friend of mine was over last night, I forgot to ask him to take some pictures with font and back profile views of the pack on my back (to judge how high the pack sits relative to my shoulders).

Nonetheless, I did get some work done.

The first thing I did was to locate the centre of the cyclotron. While this sounds simple, I didn't find it easy or obvious. While this may be elementary to most people in this forum, I will share my experience so that it may help someone else who has the same skill level as I do.

I decided to start by making a template out of thin cardboard (perhaps its poster board). First, by measuring the diameter of the cyclotron with my digital caliper (229 mm or 9"), I was able to determine the radius (114.5 mm or 4 1/2"). From there, I located the centre by tracing a cross between opposite corners of the square, which separated the template into four triangles. Using my pencil, I punched a hole in the centre, which I could then use to mark the centre directly onto the pack shell. Then I drew addition reference lines to separate the template into quadrants. These additional reference lines represent the cross that I wanted to draw onto the cyclotron, so I punched holes at places along these lines as well. By referring to Stefan's plans, I knew that I needed to draw a line from the centre that goes up 16 degrees through the upper right quadrant in order to determine the location of the cyclotron elbow. Using a steel protractor, I traced the outline of the steel arm. The middle of the two parallel lines of the steel arm would be the 16-degree line to the elbow.

Image

While lining-up my template over the cyclotron, I found it somewhat difficult to square-up the vertical and horizontal lines or the template to the shape of the shell. Using my set square, I was able to make a relative "best guess." Then I marked the shell through the holes of the template with my pencil and then I traced the lines on the shell with a ruler.

Then, on the right side of the cyclotron, I determined the height of the elbow. The height of the cyclotron line-up nicely with Stefan's plans, which are 50.8 mm or 2.0" from top to bottom. So, the height of the elbow was 17.5 mm or 0.689" from the bottom of the 12.7 mm or 1/2" ledge.

Image

Now I know the location of the elbow. The elbow I am using is an SMC 4 mm elbow that I purchased from the GBFans shop. The next step is to drill and tap a hole in the shell in order to screw the elbow into the shell.

Using my caliper, I determined that the elbow is 3/8-inch wide. Therefore, I needed to drill a 5/16-inch hole and use a tap with the nominal size of 3/8-16 NC. NC is an acronym for National Coarse and it refers to the thread.

This is my first time drilling a hole in my shell and this was my first time tapping anything in my life. Before tempting fate onto my shell in the first attempt, I decided to practice on a piece of wood. I am so happy that I did... My second trial on the piece of wood was much more successful than my first attempt.

Image

Having built up my confidence, I drilled a hole through the shell and screwed in the elbow:

Image

I had no problem drilling a hole through the polyurethane shell. I never drilled through fibreglass before, but I never had the impression that the polyurethane was going to crack. While drilling the hole, I realized that the shell is much thinner than Naptime's shell (he uses a pchrisbosh1 fibreglass shell).

Here's a view from the inside:

Image

The elbow screwed in very well. At first, I thought the tapped hole was very tight and it was difficult to screw in the elbow. After applying a little more pressure, the elbow screwed into the hole and it was very snug.

Here is a top-down view of the whole shell with the elbow:

Image

You will notice that I marked the centre, the holes and the extremities of the Clippard valve. It was getting late, so I will continue that another day.
Jonobiwan liked this
#4882114
Nicely done.

A tip if you're going to be tapping aluminum parts. Go get some cutting oil from Home Depot. It will really help.
canpara liked this
#4882130
PssdffJay wrote:Nicely done.

A tip if you're going to be tapping aluminum parts. Go get some cutting oil from Home Depot. It will really help.
Sage advice from Jay! A couple of times my tap bit got stuck in the middle of threading the aluminum. I really could've used the oil then.

I also have to thank you for providing such a comprehensive list of bolts - sizes and lengths! I used your list on my visit to Fastenal to get the hardware I needed to start attaching my aluminum parts to my shell!

Your shell work is immaculate! Well done, Mario!
canpara liked this
#4882343
A little update for you guys...

After seeing Jordin's Freeky Geeky neutrino wand in person over the weekend, I splurged and I decided to get in on one of umoribar's discounted Freeky Geeky proton gun and parts run packages. I should be receiving it in two to three months. I have updated my parts list (in the first post of this thread).

I chose the following options:
  • All holes drilled, including the vents
    Screen accurate pinch to the front and the rounded base
    GB-1 style no knurl on the side discs
    Removable back on the trigger box
    Milled right ear
    1/8" hole in the left ear
    Knub holes drilled at 9 & 12 o'clock
    Egon disc instead of the gun track support block
    Bar graph cutout to match Spongeface's bar graph bezel kit. I measured my bar graph bezel to be 38.3 mm x 9.6 mm, which is 1.51" x 0.38" in inches.
I decided against ordering the hollow rear cylinder and the hollow front cylinder, since I do not plan on installing an e-cig kit or a vibration motor in my thrower. I also decided against the chanfer edge on the trigger tip and the shaved 1/8" off of the front of the gun track.
alphabeta001 liked this
#4882746
There’s nothing like a Canadian Thanksgiving long-weekend to progress on a build. It's time to post some updates!

About my templates... Well, I probably went a little overboard, but I made one for just about every hole that I needed to drill. I relied heavily on my shell measurements and Stefan's plans. Or maybe I discovered that I like to draw...

Image

I can plan my holes all that I want, but eventually I have to start drilling.

R-331 Clippard Valve

In an earlier post, I included a photo where I had marked the location of the holes that I needed to drill into the shell for the R-331 Clippard valve. I made these marks using a template:

Image

As I drilled the center hole (using a 3/8” drill bit) for the Clippard valve, I adopted Naptime's idea of cutting a little notch.

Image

Using my sharpie pen, I put some black ink on the tips of the two screws. Once I placed the valve onto the proper location on my shell, the black ink of the screws left imprints that marked their exact locations. Since the nominal size of the screws are 3/16”, I drilled two 5/32” holes (one for each screw) on the ink imprints and tapped them with a 3/16” – 24 NC tap bit.

Image

Here is the Clippard valve mounted to the shell:

Image

Legris Straights

This is my template for the Legris straights:

Image

I determined that the nominal size of the threads are 25/64” wide, but I didn’t have the corresponding drill bits and tap sizes. So I tested a 3/8” hole in a scrap piece of plastic that I had lying around and it worked well. Then I drilled the holes in the shell:

Image

I screwed in the Legris straights by hand, like so:

Image

Finally, here is photo of the Legris Straights from outside the shell:

Image

And inside the shell:

Image

Holes for the Injectors, Beam Line and Filler Plug

Most of these holes are for 3/16" x 3" self-drilling roof screws with a rubber washer (two for the injectors, one for the beam line and one for the filler plug), so I drilled holes for them using a 7/32” drill bit.

Image

Although I could have drilled the corresponding holes in the beam line and filler plug to mount them to the shell, I decided to wait until another day. I will have access to a friend's drill press, which will guarantee straighter holes for these long screws.

Cyclotron and Powercell Lenses

Then I began working on the Cyclotron and Powercell lenses.

Benofkent Props' shell came with pre-made lens recesses (from the interior of the shell) in which the Benofkent Props red cyclotron lenses fit perfectly. However, I decided to use a separate set of clear frosted lenses that are ideal for Spongeface's Cyclotron TVG Colour Illumination Kit. The problem is that the clear lenses have a much wider diameter than the red Benofkent Props lenses.

Image

At first, I thought I would solve this problem by adopting Naptime's solution of widening the diameter of the lens recesses with the sanding tube attachment of a Dremel. I had worked out a method whereby I would stack metal washers (that are the same diameter of the cyclotron holes in the shell, which is roughly 30 mm) to the desired depth (the depth of the recess), glue them together, then attach them to a piece of scrap wood. The I would fit the washers through a cyclotron hole from the outside of the shell. Using a Dremel sanding disc, I would then sand out the polyurethane of the shell to the desired depth and width. The washers would prevent the Dremel from sanding too deep, this protecting the hole in the shell.

I know this would be easier to explain (and understand) if I had some photos or a video as a demonstration. Unfortunately, I do not. This is because I didn' follow this method.

Contrary to my initial plan, there is much less risk of messing up the shell if I sanded down my clear lenses to the diameter of the pre-existing recesses. If something goes wrong, I figured it is much easier to replace a lens than it is to fix a shell. Therefore, I decided to sand down the clear lenses instead.

Using the washer that is the same diameter of the cyclotron light hole in the shell, I clamped it to a lens to it using a vice. I sanded down the lens to the desired diameter with the Dremel.

Image

In the end, this worked well, with one exception. I accidently scratched one of the lenses with my dremel (I am still beating myself up over this one), but since the lenses are frosted, it might not matter. Once I have the lights installed in my pack, I might replace this lens if the scratches are noticeable.

Image.

I used a similar method to sand down the large blue powercell lens that was included in the Benofkent Props kit. Instead of using a washer, I just marked down the measurements of the rectangular shell recess onto the protective adhesive plastic of the lens with a pencil. A word of caution: it is better to sand down the lens than to try to cut it. This prevents cracking.

Image

Ion arm end cap, Dale resistors and Legris elbow.

Next is the Ion Arm.

Although I didn’t mount the Ion Arm to the shell, I mounted the end cap, the Dale RH-25 and RH-50 resistors and the Legris elbow.

I started with the end cap, which I had just placed in its proper position and marked the holes with a pencil.

The two black ridged cap-style bolts that came with the end cap are M5 x 10 mm. I drilled a 5/32” holes into the Ion arm for each of the two screws and tapped them with a nominal size M5 x 0.8 mm. The holes that I drilled were 14 mm deep, so they were a little deeper than necessary.

You will notice in the photos below that I still need to drill a hole in the end cap in order to screw in the Clippard fitting. That will be for another day.

Here are my templates for the Dale RH-25, RH-50 and PH-25 resistors:

Image

I have purchased an original PH-25 resistor (no ring variant) from someone here on GBFans, but I haven’t received it yet. I won’t drill the hole for this resistor until I have received the part.

Image

In order to secure the Dale RH-25 and RH-50 resistors, however, I found some little screws in the garage that worked perfectly (I haven’t measured them, but I can if anyone is interested). For the two screws of each resistor, I drilled a hole with a 7/64” drill bit. Then I put in the screws manually with a screwdriver.

For the Legris elbow, I used the same 5/16” hole and 3/8”-16 NC tap that I had used earlier on the cyclotron.

Here are the results, starting with a view from the front:

Image

And one from the side:

Image
Allghostsmatter liked this
#4882800
canpara wrote:
Venkman's Swagger wrote:Nice clean work dude. Loving it!!
Thanks! I really appreciate the enthusiasm. It's a huge confidence boost!
You're welcome fella. Just saying what I see. Keep it up :)
#4882817
Nice work lad, great looking shop you have too. Some nice space, and all proper planned assembly. Should turn out great ;)
canpara liked this
#4882853
OCP_Model-001 wrote:Nice work lad, great looking shop you have too. Some nice space, and all proper planned assembly. Should turn out great ;)
Thanks! Your remark about my work space made me chuckle, since my build is actually quite mobile and all over the place! The photos in my last progress update are taken in my parents' garage in Red Deer, Alberta, which is about a one hour and a half drive from my place in Edmonton. I have been trying to take advantage of their garage as much as I can, since I live in a pretty small bachelor pad, haha. I have also been taking advantage of a friend's garage in Edmonton as well. It's a good thing that I have a hatchback with room to lug around my big cardboard box with all of my pack parts, in addition to all of my tools and whatnot.

I made lots of progress today in Red Deer, but now I am back in Edmonton. I have to work tomorrow and it's pretty late, so I will have to share all of the new build photos tomorrow.

Here's a teaser:
  • I organized all of my bolts and pneumatic fittings.
    I fitted the metal vacuum line tube into the shell.
    I drilled the pilot holes for the injector tubes, the beam line and the filler plug using a drill press.
    I completed the HGA (including the four socket head screws, the SMC elbow, the Clippard brass elbow and the shell mounting with one long socket head screw).
    I installed the shock mount (the bumper) to the shell.
    I added the Clippard brass elbow to the aluminum ion arm end cap.
    I mounted the PPD with self-drilling screws.
I think that's about it. Stay tuned!
Last edited by canpara on October 13th, 2016, 8:57 pm, edited 2 times in total.
#4882919
Nicholszz wrote:MMMM. This is looking amazing.
Think ima have to invest in all this Spongeface stuffs.
I would highly recommend it... Not only are his products top notch, but his service is second to none. Doug answers all of my e-mails very promptly.
#4883040
Lesson Learned: Properly Labelling and Organizing Bolts and Screws

In my last update, I explained how I mounted the Dale RH-25 and RH-50 resistors to the Ion Arm. Well, I ended up grabbing a four screws that were lying around the garage and that happened to be about the right size. Although it isn’t a big deal, I regret doing that, since I realized later that I had already purchased the proper screws:

Image

For some reason, I thought that I might not have the appropriate screws for the resistors. However, as I looked over my list of bolts and screws in the first post of this thread, I realized that I did indeed have four M3 10 mm black ridged cap-style socket head screws for the resistors.

In order to prevent this from happening again, I grabbed a ton of little transparent plastic bags and I labeled all the types of bolts, screws and pneumatic fittings that I had with masking tape. The labels include the measurements of the bolts and screws as well as what they’re used for (for example: M3 10 mm ridged cap-style socket head screws / Ion Arm Resistors). I separated them in a cheap organizer that I bought at Home Depot for about $9:

Image

Hopefully this will prevent me from making the same mistake again in the future!

Grinding the Vacuum Line Tube

The aluminum tube for the vacuum line is supposed to plug right into the Benofkent Props shell, but after trying it out, I found that it was difficult to press the tube into the corresponding hole. I think this was done so intentionally. Using an angle grinder, I rounded the edges of one end of the tube so that it could be inserted into the hole in a snug manner.

Image

Hydrogen Gas Actuator (HGA)

Until this point, I hadn’t touched the HGA.

Although I have seen a number of build threads where people are mounting the HGA using a bolt from the interior of the shell, this method seems to be more common with those who have an aluminum HGA.

In the Benofkent Props kit, the HGA is made of resin and it’s hollow. Only one end of the cylinder is walled, and this wall is much thicker than the one on the aluminum variants (as I would come to realize later on).

After consulting with Ben of Benofkent Props through Facebook Messenger, he told me that he mounts the HGA to the shell using an M5 countersunk socket head cap screw that goes from the outside of the HGA, through the pack shell, then secured on the inside of the shell with a myloc and a washer. Since I had just reorganized all of my bolts and screws, I knew that I already had the correct M5 80 mm socket head cap screw on hand.

Initially, I was worried that this was not the screen-accurate way of mounting the HGA. However, after looking at Stefan’s plans, I realized that the GB1 Proton Pack has a socket head cap screw mounted in the same way as Ben’s builds. Stefan’s plans have the following note: “The HGA is mounted with 0.25” Socket Head Cap Screw to the Crank Generator. The head of this crew touches the back side of the HGA-Label.”

From then on, I knew what to do… More templates!

After carefully measuring the shell and comparing the measurements to the Stefan’s plans, I found that they were nearly identical. I then started building two templates: one to mark the location of the mounting screw on the pack shell, as well as another to mark the location of the mounting screw on the HGA.

Image

The second template would mark the location of the mounting bolt as well as the four M5 socket head cap screws that came with the kit (M6 10 mm).

Although I normally write down the length of my reference lines on my templates, I didn’t do that on this template for some reason. The diameter of the face of the HGA cylinder is 60 mm (2.375”), while the diameter of the label is 35 mm (1.375”).

Image

Using this second template, I also measured the side of the HGA cylinder using my digital caliper. It measured about 63 mm in height and 63 mm in length. Then I made marks on the cylinder in order to trace a transversal centre line. Using Stefan’s plan, I found the locations of the Legris elbow (in this case, an SMC elbow) and the Clippard brass elbow:

Image

I noticed that the hole for the Clippard brass elbow is very close to the extremity of the cylinder. Half of the hole there would go through the thick resin wall of the cylinder’s face, while the other half would go through the hollow part of the cylinder. I didn’t think much of it at the time. However, when it came time to drill that particular hole, I decided to displace the Clippard brass elbow to the left so that the hole would narrowly miss the wall. The holes I drilled were the same as the other Legris and Clippard elbow holes: 5/16” hole with a 1/8-16 NC tap. Take a look in the photo below (with everything mounted in place):

Image

I had the luxury of using a drill press to drill all of the holes on the HGA. For the centre mounting bolt (M5 80 mm), I used a 13/64” drill bit to drill the hole. In order to drill out a space for the countersunk cap screw, I enlarged the circumference of the hole with a 3/8” drill bit. The depth of the countersink was 5 mm. In the end, the head of the screw sat quite flush with the face of the HGA cylinder:

Image

For the four M6 socket head cap screws (M6 10 mm), I drilled the holes using a 13/64” drill bit and I tapped them with an M6 x 1 bit.

Drilling the Pilot Holes for the Injector Tubes, the Filler Plug and the Beam Line

Although I had already drilled the holes for the injector tubes, the filler plug and the beam line in the shell, I waited to drill the holes through the resin parts. I marked the hole locations using the same templates that I had used on the shell. The holes need to be deep enough for the M5.5 75 mm (#14 x 3”) self-drilling roof screws, so I waited until I had access to a drill press rather than attempting to drill the holes with my drill.

Unfortunately, my dad’s small drill press wasn’t high enough to accommodate the length of the drill bit and the height of the resin parts. However, his friend has a drill press that is much taller (and fancier). It was really a pleasure to work with. Here is a picture of when we drilled holes in the injector tubes:

Image

I then proceeded to drill the same holes in the filler plug and the beam line. I was going to drill the holes on the flipside (the top side) of the parts (specifically the holes for the nycoil tubing on the injector tubes and the hole for the Clippard brass elbow on the beam line), but I realized that I wasn’t exactly sure how I was going to attach the nycoil tubes. More research is necessary, so I decided to wait.

Installing the Shock Mount

Although attaching the shock mount (the bumper) to the shell was not the most difficult part of the build so far, it did have the most dramatic effect on me personally. I had that first “AH!” moment, where I felt like this was really coming together.

Earlier on in the week, I had marked the placement of the shock mount holes. There are five holes in all: two on the left side and two on the right side ((for M6 30 mm socket head screws) and one in the middle (for a M6 50 mm socket head screw). If the measurements of the shock mount weren’t identical to Stefan’s plans, they were very close. So, I prepared a template for the side holes (which I placed on the inside surfaces—see photo below) and another for the centre hole (which I seem to have misplaced and I neglected to take a picture):

Image

Then it was time to drill.

But wait… I have to share an interesting side note.

I was originally going to use one M6 50 mm ridged black cap style socket head screw to secure the shock mount, as per Ben’s instructions. Then I realized that the thread in the GBFans metal bellows was not metric, but imperial. I knew that PssdffJay used the same bellows for this pack, so I checked his build thread to determine what bolt I need to use. Jay used a 1/4”-20 x 2 stove bolt, but I decided to get a shorter ¼”-20 x 2” bolt (50 millimeters is very close to 2” long) black ridged cap-style socket head screw from D&D Bolt Supply in Red Deer (I also picked up a 2 ½” long bolt like Jay, just in case). The bolt screwed into the bellows perfectly. I have updated my bolts and screws list in the first post of this build thread reflect this change.

Noooooooow it’s time for the holes.

Firstly, I drilled the four holes on the sides of the shock mount (for what is normally called the bumper screws). Since I was using M6 30 mm screws (the same type of screws that are used to hold the shell to the motherboard), I drilled the holes using a 15/64” bit. I did not drill the corresponding holes in the shell. It was important to me to save this step until the end, since this would really help with keeping the shock mount both level and plumb.

Secondly, since I had already marked the centre of the cyclotron (on the exterior of the shell itself) at the start of my pack build, I drilled a ¼” hole for my new ¼”-20 x 20” bolt.

Thirdly, using my dad’s dress press, I drilled a ¼” hole in the centre of the shock mount. Here’s a photo of me lining up the shock mount to the drill bit:

Image

Fourthly, I needed to create a spacer that would fit between the pack shell and the shock mount. At first, I didn’t know how high the shock mount was supposed to be over the cyclotron. In the photos of other peoples’ pack builds, I always thought the shock mounts looked a lot higher than the one on my own pack. Did others purposely raise the shock mount so that it’s extremities do not line up with the end of the shell (or sit flat against the motherboard)?

After asking Ben, he told me that the space between the shell and the shock mount is about 6 mm and that he makes his spacers out of aluminum tubing. By placing my shock mount on my shell (with the ends of the shock mount lining up with the end of the shell), I measured about 6 mm of distance between the cyclotron and the shock mount as well. I then knew what I had to do.

My dad had conveniently found a hexagonal piece of metal (it looked like a nut, but it was hollow inside) that he had found in his garage (I wish I knew the name for this kind of part). I decided to use that as a spacer. At 10” high, it was too tall, so we grinded it down until it fit perfectly:

Image

Image

Fifthly, after screwing on the bellows, and with the spacer in place, I then needed to drill the four side holes in the shell to insert the bumper screws. This was the “last step” that I was referring to earlier.

In all my measurements (and in Stefan’s plans), the centre of the cyclotron runs horizontally through two “side plates” (I don’t know what else to call them) on the end of the shell, which ended up being an important point of reference (even on the outline of the aluminum motherboard). All I needed to do was to have the ends of the shock mount sit flush against the motherboard (as discussed earlier), line-up the shock mount holes to the space between those “side plates,” insert my ¼” drill bit in the shock mount holes, make sure the centre of the shock mount was plumb using a set square, then drill my holes:

Image

Et voilà! Everything looked level and plumb!

Image

Image

I say looked because the level was near useless. It was very hard for me to gauge the level of the shock mount, since the table I was working on probably wasn’t level in the first place. And please disregard the level in the photo… The bendy bellows certainly isn’t the best place to put it.

Inserting the Clippard Brass Elbow into the Ion Arm

After making some careful measurements, I found the location of the hole I wanted to drill into the aluminum block of the ion arm (I forgot to jot down the size of the drill bit that I used as well as the depth of the hole). Again, using my dad’s drill press, I used the appropriate tap drill size to drill the hole:

Image

After tapping the hole in the ion arm, I screwed in the Clippard brass elbow to make sure that it would stop turning with the hose barb pointing in the desired direction. It turns out that the hose barb was pointing directly at nine o’clock when it needs to be at 12 o’clock.

In the end, I had to enlarge the diameter of the top of the hole so that the elbow could sink a teeny bit into the aluminum block (and thus permit it to screw in at an additional quarter-turn). This worked perfectly:

Image

Mounting the Primary Power Distributor (PPD)

For this one, I had to ask Ben what kind of screws he used to mount the PPD. He informed me that he used 5 mm self-tapping screws. When I went to D&D Bolt Supply in Red Deer, I picked up two 10 x ¾” self-drilling screws (again, I have updated my bolts and screws list in the first post).

No template this time, since the holes are not visible once the PPD is mounted. Although I didn’t jot it down, I believe I used a 3/16 bit to drill two evenly-spaced holes in the shell. With my dad’s help, we squared up the PPD on the shell, then from the inside of the shell, we marked the location of the holes onto the side of the PPD with the screws themselves:

Image

Then I drilled two pilot holes into the PPD with a 5/32” drill bit. Finally, using a 5/16” socket, I screwed in the self-drilling screws from the inside of the shell.

Image

In hindsight, I may have done this step a little too fast. Although the PPD is perfectly flush with the shell, it may be rotated just a little too much towards the interior of the pack. Gaaaah. When we were lining up the PPD to make the marks through the shell holes, I must have been judging its placement from a poor perspective. See the photo below… And please be frank with your thoughts!

Image
#4883068
Some questions that I am asking myself right now:

1) To insert the red and blue nycoil tubes into the injector tubes and the pack shell (on the side of the cyclotron) does everyone screw in Clippard hose barbs (one for each hole)?

2) Is a Clippard hose barb necessary for the top of the PPD as well?

3) What diameter is the shell hole that is used to insert in the ribbon cable?

I'll be scouring the various build threads this weekend to find answers to these questions, but your help is certainly appreciated!
  • 1
  • 2
  • 3
  • 4
  • 5
  • 7

The yellow parts are raw 3D prints, unsanded and u[…]

Sorry, I hadn't seen any of these replies. Either […]

Uniform Tips

Sorry for the triple post (you guys have gotten […]

Proton Props???

Ugly Little Spud, Did you actually get the pack?[…]