#4913416
EDIT - disregard. I found a youtube video illustrating the entire build.

I just started building the Charlesworth Dynamics standard kit. In the instructions it mentions to drill holes into the rear frame, but no mention of drilling holes into the handle frame. The screws will not fit into the handle frame. Do I drill into this frame too?

There any threads on building this kit?

From the instructions:
-If needed, drill out 6 upper holes on rear frame with 9/64” bit. A #6 screw should pass through freely. Drill out tab holes with 1/8” bit to t #4 screw.
-Screw rear frame to handle frame with four #6 x 1⁄2 socket head screws. You can use the additional 2 screws on center column if desired but they are really only needed if installing electronics, which adds weight.

    My Little Pony/Ghostbusters crossover done by my d[…]

    Great work identifying the RS Temperature Control […]

    I read Back in Town #1. Spoilers : Hate to b[…]

    I'd really like to see the new t-shirt unlocks tra[…]