- August 2nd, 2024, 9:33 pm#4999427
I was able to get a little bit of work in today after the day job. I had painted the lever retention disk and done some finishing work along with the rear cylinder. I ended up filing one hole out of the wand body slightly to accommodate the bolt pattern of the oddball cylinder. Took my time and did it carefully so as not to make the hole bigger than it has to be.
Was able to get the cylinder mounted and inserted the lever as well. I replaced the grub screw in the retention disk with a socket head bolt to match the setup of the Spengler wand.
We’ll see what additional tasks I can get around to performing this weekend. The real job is heating up and progress on this build might slow down even more
Was able to get the cylinder mounted and inserted the lever as well. I replaced the grub screw in the retention disk with a socket head bolt to match the setup of the Spengler wand.
We’ll see what additional tasks I can get around to performing this weekend. The real job is heating up and progress on this build might slow down even more